SP

Submittal Procedures and Shop Drawings

The construction process requires contractors to submit several different types of documentation to the project owner and consultant. You will gain insights into: 1. The submission, review, and return of shop drawings and other submittals 2. Design delegation vs. design assist, as they relate to shop drawings 3. Each party’s obligations and the detailed administrative and procedural requirements 4. Other action submittals required to confirm compliance with the contract documents, e.g., samples 5. Documentation required prior to the start of construction and the first application for payment, like insurance certificates and construction progress schedules 6. Why the submittal process should not be used for substitutions and changes

Activate subscription

To view, please activate your subscription

Latest Webinars

CCDC Newsletter Signup

Signup

Upcoming Webinars

CCDC developed the CCDC 31 to replace ACEC’s Document 31. Similar to other CCDC documents, CCDC 31 was developed with input from Owner representatives, providing a balanced approach in its drafting. This document also adopts standard CCDC terminology, found throughout the suite of CCDC documents.

More info